PreFeasibility Mining Study Weld Range Iron Ore Project Report Prepared for Sinosteel Midwest Management Pty Ltd Prepared by WOR002_MIN_RP_005: Rev5 November 2008 . SRK Co WOR00 CM/TC/srl Midsized mining equipment for mining both ore and waste was selected. The same mining fleet is used for the mining of ore and waste,