Earth connectivity check. A separate pilot wire is run from distribution/ equipment supply system in addition to earth wire, to supervise the continuity of the wire. This is used in the trailing cables of mining machinery. If the earth wire is broken, the pilot wire allows a sensing device at the source end to interrupt power to the machine.